Malaysia CDM 2024 · DOSH-ready

Construction compliance,
generated with confidence.

SmartCDM turns a project brief into an audit-ready CDM 2024 pack — Pre-Construction Information, DOSH notification, Construction Phase Plan, H&S File and Risk Register — with duty-holder logic and Schedule 4 particular-risk detection built in.

Invitation-only access. Book a walkthrough with our compliance team.

Compliance readiness

Live penalty-exposure score

87
Ready
Duty holders appointed4 / 4
Mandatory documents5 / 5
DOSH notifiedapproved
Schedule 4 risks2 open
+18% this quarter

1,240+

Documents generated

Duty-holder logic

Roles cascade automatically

Client
Ubbim Sdn. Bhd.
PCWD
Prima Consultants
Designer
Studio Arke
Principal Contractor
Zen Build

Documents approved

Trailing 12 months

+42% YoY
J
F
M
A
M
J
J
A
S
O
N
D
Intelligent extraction

47s

Avg intake → draft

Risk register

Schedule 4 tags

Falls > 2mExcavationConfined spaceHot worksLifting opsLive trafficDemolition

DOSH notification

>30 days or >500 person-days

Auto-detected from intake. Notification pack prepared before works commence.

Audit trail

Every version, every approval

  1. Smart draft12:04
  2. PCWD edit12:18
  3. Approved13:02

Live compliance intelligence

Every duty, measured.

SmartCDM scores your project against CDM 2024 in real time — readiness, HIERAC risk reduction, Schedule 4 exposure and document coverage, all on one canvas.

Project readiness

Intake to handover-ready in 8 weeks

Sample project · Menara Cendana

Risk register

RAG exposure

HIERAC

Inherent vs residual risk

Avg −72% after ERIC controls

Document coverage

CDM 2024 obligations met

6 of 6 statutory streams

Efficiency

Admin hours per document pack

Manual vs SmartCDM

Document suite

The full CDM 2024 pack, drafted for you.

PCI

Pre-Construction Information

Site, hazards, existing services and design assumptions — issued to the PC before mobilisation.

Preview
DOSH

DOSH Notification

Auto-triggered when duration > 30 days or > 500 person-days. Pre-filled Form JKKP.

Preview
CPP

Construction Phase Plan

PC-owned live plan with Schedule 4 particular-risk controls, RAMS and emergency arrangements.

Preview
H&S File

Health & Safety File

Living document — appended through project life, handed over to Client at completion.

Preview
Risk

Risk Register

Auto-populated from smart drafts, tagged against Schedule 4 categories, RAG-scored.

Preview
Roles

Duty-holder Matrix

Client, PCWD, Designer, Principal Contractor — appointments in writing, defaults tracked.

Preview

Workflow

From brief to audit-ready in an afternoon.

01
Intake

Paste a brief. SmartCDM extracts scope, duration, person-days, hazards.

02
Assign duty holders

Client, PCWD, Designer, PC — defaults enforced by CDM 2024.

03
Generate & approve

SmartCDM drafts each document. Edit inline. Approve to lock a version.

04
Export & audit

Branded PDF, comment threads, full audit trail with diffs.

Get access

Request a demo

SmartCDM is onboarded by our compliance team — there's no self-serve sign-up. Tell us about your projects and we'll walk you through the full CDM 2024 lifecycle: intake, duty-holder appointments, DRA capture, HIERAC risk register, and the owner H&S File handover.

  • 45-minute guided walkthrough on a live sample project.
  • See every generated document, PDF export and evidence archive.
  • Workspace provisioned for your team after the session.

Access is by invitation only. We'll set up your workspace after the demo.

Stop drafting. Start approving.

See SmartCDM run on a live CDM 2024 project. Book a guided demo and we'll set your workspace up for you.